Microbial-enzyme wastewater treatment

Cut sludge, aeration cost and FOG —
biologically.

Ecotru™ is a microbial-enzyme treatment for wastewater plants, grease traps and leachate ponds. Documented field results. Pilot-first — you validate it on your own site before committing.

Documented field trials Produced under Good Manufacturing Practice (GMP). Works within existing systems — no capex
Begin the journey
The operational problem

Sludge, aeration and FOG
drive operating cost.

Frequent desludging, long blower runtimes and persistent FOG increase operating cost and put discharge performance under pressure. Ecotru™ works within existing systems through a controlled, pilot-first program.

Clean water with gentle ripples
Pilot first
Validate it on your site
Non-chemical
Biological treatment

Built for existing systems.

Ecotru™ works with beneficial microbes and enzymes — no chemical shock treatment or masking agents. It supports breakdown of organic waste into water and CO₂ while working within existing treatment systems.

Biological treatment
Beneficial microbes and enzymes.
Operationally compatible
Works within existing systems — no capex.
Non-chemical
No harsh chemicals or masking agents.
Pilot validated
Assess results on your site before commitment.
What is Ecotru™?

Living biology that does the work for you.

A consortium of beneficial bacteria, yeasts and enzymes. Supports breakdown of organic waste into water and CO₂.

Ecotru biological process: activate the culture, digest organic waste, and restore cleaner discharge.
  1. 01

    Activate

    Dissolve in water and allow 12-24 hours for the microbes to wake.

  2. 02

    Digest

    Enzymes break down FOG, sludge and odor at their source.

  3. 03

    Restore

    The system moves toward cleaner discharge with less residual sludge.

Two formulations. One philosophy.

Ecotru™ Extra
Ecotru™

Ecotru™ Extra

Advanced Biological Grease & Sludge Remediation

Break down fats, oils, grease and organic sludge at the source — without harsh chemicals. True digestion, not emulsification.

up to 82%Oil & Grease reduction — Ampang Jajar leachate trial (measured)up to 79%BOD reduction — Ampang Jajar leachate trial (measured)up to 83%COD reduction — Ampang Jajar leachate trial (measured)
Grease traps (restaurants, hotels, food courts)Commercial kitchensFood manufacturing facilitiesIndustrial wastewater treatment plants+3 more
Is this right for me?
Ecotru™ OD
Ecotru™

Ecotru™ OD

Advanced Biological Wastewater & Odor Control

Stabilize wastewater systems. Reduce sludge. Reduce odor at the source — without chemical shock treatment.

up to 70%Sludge reduction — IWK Kepala Batas STP trial (reported)up to 40%Aeration energy savings — IWK Kepala Batas STP trial (reported)SignificantOdor reduction — Cypark Landfill trial (reported)
Municipal wastewater treatment plants (WWTP)Industrial wastewater plantsLandfills & leachate pondsSludge holding tanks+3 more
Is this right for me?

For contained lakes, ponds and other still-water applications, suitability is assessed through an on-site pilot.

83.5%
COD reduction — Ampang Jajar leachate trial (measured)
BOD 160 → 44
IWK Kepala Batas STP trial (measured)
15 → 9 hrs/day
Blower runtime — IWK Kepala Batas (reported)
9/10
Grease trap condition — Kasturi Resort (staff-rated)

Dosing calculator, microbial composition, parameters & validation data.

Evidence-Based

Documented Case Studies

Named field trials from municipal, landfill and hospitality sites in Malaysia, with measured and reported results clearly distinguished.

BOD 160 → 44 | COD 300 → 78
Measured discharge improvement (~72–74%)
Municipal

IWK Kepala Batas

Municipal WWTP — 1-month plant trial

Penang, Malaysia

One-month trial on a 202.8 m³ aeration tank using 11.3 kg of Ecotru™. Blower runtime, sludge volume and discharge quality all improved, with no desludging needed during the trial.

  • Blower runtime 15 → 9 hrs/day after 15 days (Reported)
  • ~40% aeration energy reduction, based on blower runtime (Reported)
  • 50–70% sludge reduction (Reported)
  • Zero desludging required during the trial month (Reported)

Discharge BOD/COD are measured values. Sludge and energy figures are trial-reported.

83.5%
COD reduction (measured)
Landfill

Ampang Jajar Transfer Station

Leachate & FOG remediation — 1-month trial

Penang, Malaysia

One-month treatment of landfill leachate sludge produced lab-measured reductions across BOD, COD and oil & grease.

  • BOD 20,940 → 4,260 mg/L (79.7%) (Measured)
  • COD 54,560 → 9,020 mg/L (83.5%) (Measured)
  • Oil & Grease 11,963 → 2,100 mg/L (82.5%) (Measured)

Laboratory-measured before/after values.

Sludge liquefied & receded to base level
Qualitative field observation
Landfill

Cypark Landfill

Overflow leachate pond — condensed 1-month regimen, Feb 2024

Ladang Tanah Merah, Malaysia

Achieved under constrained conditions — the site initially lacked the IBC tanks, pumps and hoses for full dosing, so the trial ran on limited, improvised application.

  • Solid, thickening sludge transitioned to a liquid state within days (Field observation)
  • Sludge receded toward base level over the month (Field observation)
  • Site personnel reported significant odor reduction (Reported)

Qualitative field observations under a condensed, equipment-constrained regimen. Not lab-quantified.

9/10
Grease trap condition after treatment (staff-rated)
Hospitality

The Kasturi Resort

Grease trap & odor control — Sept 2017

Cherating, Malaysia

Chemical dosing had failed to resolve odor and clogging. After nightly Ecotru™ Extra dosing into kitchen sinks and the grease trap, the resort adopted it into permanent ongoing use.

  • Odor control: 8/10 (Staff-rated)
  • Less pipe clogging: 8/10 (Staff-rated)
  • Ease of use: 8/10 (Staff-rated)

Resort staff's own ratings from the field report — operator-reported, not laboratory measurements.

Results depend on site conditions (flow, retention time, organic loading, temperature, pH, dissolved oxygen) and are confirmed through an on-site pilot before any supply commitment.

Deployed across municipal, industrial, landfill and hospitality sites in Southeast Asia.

How it helps you

Pick your world. See your win.

Every sector has its own operating pressures. Choose your setting to see what an Ecotru™ pilot would assess.

🏭
Without Ecotru™
Industrial Plant headaches
  • Rising aeration costs
  • Frequent desludging
  • High BOD/COD loads
With Ecotru™
Your results
Ecotru™ OD
  • Lower aeration demand
  • Reduced sludge handling
  • More stable discharge
Get this for my plant
How a pilot works

You don't have to take our word for it.

Every engagement starts with a controlled on-site pilot.

  1. 01

    Baseline

    We capture current readings on one line or site.

  2. 02

    Dosing

    An agreed regimen runs over a defined window.

  3. 03

    Monitoring

    Before-and-after data is tracked, ideally with local laboratory testing.

  4. 04

    Review

    Results are assessed together before any supply commitment.

Technical documentation

Documentation for technical review and procurement.

Request the material needed to assess storage, composition, dosing and site fit before beginning a pilot.

  • MSDS
  • COA
  • Dosing & application guide
  • Microbial composition
  • Storage & shelf life
Distributor terms

A concrete commercial framework.

Territory, support and commercial terms are defined before appointment.

  • Territory exclusivity available against defined performance terms
  • Product and application training provided
  • Dosing guidance and technical support
  • Co-branded marketing materials
  • Distributor pricing; MOQ on application
  • Full documentation pack: MSDS, COA, case studies and dosing guide
FAQ

Questions before a pilot.

Technical pack & partnership

Get the case-study pack + MSDS/COA

Full trial data, safety documentation and dosing guidance.

What the pack includes

  • Full trial data and case-study detail
  • MSDS and COA
  • Dosing and application guidance
  • Technical reference material for site review